Delivered RemBind sorbent for a project at a contractor’s laydown yard in Australia. Successfully injected into 8 temporary direct push points emplacing sorbent between 2 and 4.5 m below ground surface (bgs). Existing and migrating PFAS concentration in groundwater was transferred to the RemBind effectively reducing aqueous concentrations and eliminating further migration.